FIELD: construction. SUBSTANCE: bridge intermediate gantry pier has a cross extensible supporting beam and two pairs of length combined supporting pillars, upper ends of which are hinged to the beam. Every supporting pillar upper part is made in the form of two distancing up branches, low parts of which are joined by an intermediate base. Every pillar low part is mounted on a supporting slab. Supporting slabs of every pair of pillars are joined by a supporting slat with a spur forming. Supporting slabs and supporting slats are joined to each other correspondingly by edge hinges and a middle hinge. The pier has a rope in a block system, mounted on every pair of pillars and made in the form of a polyspast with a compensation apparatus. The apparatus has guides, a spring slider, stopping and guiding cups. Guides are made as slats with L-shaped cross section. The slider also has L-shape. One of its flanges has an axis-rod with the polyspast movable blocks slipped over it. The polyspast immovable block is fixed on the upper part of a pillar. The rope, one end of which is fixed to the middle hinge, is placed in the immovable block of polyspast and in series rounds its movable blocks, mounted on pillars of every pair. The other end of the rope is connected to the drive. EFFECT: bridge intermediate gantry pier is very useful in bridge construction. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
INTERMEDIATE GANTRY SUPPORT OF BRIDGE | 1992 |
|
RU2072405C1 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE | 1992 |
|
RU2065515C1 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE AND DRIVE CARRIAGE (OPTIONS) | 1993 |
|
RU2057836C1 |
DEVICE FOR TESTING THE BRIDGING MECHANISM OF BRIDGE LAYING MACHINE | 1994 |
|
RU2097731C1 |
DOUBLE-TRACK DOUBLE-SECTION MECHANIZED BRIDGE | 1994 |
|
RU2102552C1 |
METHOD OF AND DEVICE FOR LOADING AND UNLOADING OF LONG-CUT LOADS FROM VEHICLE | 1992 |
|
RU2057660C1 |
AEROMOBILE CARGO TRANSFER COMPLEX | 1992 |
|
RU2047552C1 |
BRIDGE CONSTRUCTION AND BRIDGE ASSEMBLY MACHINE FOR TRANSPORTATION, ASSEMBLY AND LAYING OF BRIDGE CONSTRUCTION ON OBSTACLE | 2001 |
|
RU2210656C2 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102555C1 |
METHOD FOR MANUFACTURE OF HALF-TRACKS OF MECHANIZED DOUBLE-TRACK DOUBLE-SECTION SPAN STRUCTURE OF BRIDGE UNIT | 1995 |
|
RU2102553C1 |
Authors
Dates
1994-02-28—Published
1991-12-27—Filed