FIELD: civil engineering. SUBSTANCE: method for automatic laying and compacting concrete mixture includes transporting concrete mixture under pressure along a pipeline, concreting the construction by sections according to sequence of operations predetermined in advance, layer-by-layer concrete compacting, determination of time to supply concrete mixture into the pipeline. Then concrete mixture compacting, measuring thickness of the layer being laid and comparison the same with predetermined one, determination of compact extent of the concrete mixture in each layer begins. Section concreting is finished after achievement preset height. Then pipeline is transported to the next section. EFFECT: high speed of concreting. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE OF CONCRETE MIXTURE CASTING AND COMPACTION PROCESS CONTROL | 1993 |
|
RU2074818C1 |
METHOD FOR WINTER CONCRETING THE BUILDING OF HYDROELECTRIC POWER PLANT | 1993 |
|
RU2081272C1 |
METHOD FOR ERECTING SMALL-STOREY BUILDINGS AND DEVICE FOR IMPLEMENTING THE SAME | 1992 |
|
RU2057864C1 |
MOBILE SHUTTERING | 1993 |
|
RU2071536C1 |
DEVICE FOR MANUFACTURING NEGATIVE CURVATURE AND METHOD OF MANUFACTURING NEGATIVE CURVATURE SHELLS | 1998 |
|
RU2149963C1 |
METHOD FOR RESTORATION OF COMPRESSED REINFORCED CONCRETE ARTICLES | 1996 |
|
RU2116416C1 |
UNATTENDED CATHODIC PROTECTION STATION | 1996 |
|
RU2102532C1 |
METHOD FOR CONNECTING GIRDERLESS CAST-IN-PLACE FLOOR WITH COLUMN | 2003 |
|
RU2244076C1 |
MIXER-POROGENERATOR | 1996 |
|
RU2109557C1 |
FOUNDATION FOR METAL COLUMN, METHOD OF FOUNDATION CONSTRUCTION AND ALIGNMENT | 1995 |
|
RU2123091C1 |
Authors
Dates
1996-04-10—Published
1993-03-01—Filed