FIELD: hole drilling. SUBSTANCE: process of borehole casing includes section by section descent of casing string, pressure grouting of casing string, suspension of section of string in anti-ejection equipment mounted on preceding casing string. On termination of borehole casing with lower section anti-ejection equipment is dismounted and string head is installed. This section after descent and joining to lower section is pulled with allowance for temperature conditions of joint of section of casing string. In this case suspension of upper part of upper section of casing string is carried out within period from start of setting of grouting solution but not later than 2/3 of period of its setting. Pulling is performed with effort calculated on basis of temperature conditions in part of bore hole close to head. EFFECT: increased quality of borehole casing.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CASING | 1992 |
|
RU2054527C1 |
DEVICE FOR TWO-STAGE CEMENTING OF CASING STRINGS | 1992 |
|
RU2054526C1 |
METHOD FOR STRENGTHENING OF WELL | 1996 |
|
RU2107804C1 |
LINER CEMENTING METHOD | 0 |
|
SU1742466A1 |
0 |
|
SU1670088A1 | |
ARRANGEMENT FOR JOINING CASING SECTIONS | 0 |
|
SU1357535A1 |
METHOD FOR WELL DRILLING | 0 |
|
SU1801169A3 |
SWIVEL SUSPENSION FOR RUNNING AND CEMENTING FLUSH CASING STRINGS | 0 |
|
SU1262024A1 |
METHOD OF PRESSURE TESTING CASING STRING | 1991 |
|
RU2010941C1 |
ARRANGEMENT FOR RUNNING DOWN AND CEMENTING LINERS AND CASING SECTIONS | 0 |
|
SU581244A1 |
Authors
Dates
1996-04-10—Published
1992-12-08—Filed