FIELD: well drilling. SUBSTANCE: upon completion of cementing, casing string is let stay idle for the period of initial set of cement slurry. Then surplus internal pressure is built up and maintained during pressure testing, the wellhead pressure variation being recorded. Pressure testing process is ceased later than cement final set time. EFFECT: pressure testing of casing string improved.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR STRENGTHENING OF WELL | 1996 |
|
RU2107804C1 |
METHOD FOR SHUTOFF OF INFLOW OF FOREIGN WATER FROM CASING STRING-BORE-HOLE ANNULUS | 1991 |
|
RU2015315C1 |
METHOD OF BOREHOLE FIXING | 1990 |
|
RU2057903C1 |
METHOD FOR WELL CEMENTATION | 1992 |
|
RU2023137C1 |
PROCESS OF BOREHOLE CASING | 1992 |
|
RU2057897C1 |
PROCESS OF PRESSURE GROUTING OF WELLS | 2000 |
|
RU2184212C2 |
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
CASING COLUMN CEMENTATION METHOD AND DEVICE FOR REALIZATION THEREOF | 2004 |
|
RU2293838C2 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
CASTING METHOD OF CEMENTING | 2007 |
|
RU2345212C1 |
Authors
Dates
1994-04-15—Published
1991-07-15—Filed