FIELD: oil and gas production industry. SUBSTANCE: according to method, after seating of separation plug on thrust ring and obtaining stop pressure on completion of forcing-through of cement slurry into annular space, pressure in casing string is reduced down to value which is not less than difference of hydrostatic pressures at well bottom-hole by columns of cement slurry and forcing-through liquid. Casing string is subjected to excessive pressure for no shorter time than up to start of hardening but not for longer than 2/3 of period of cement slurry hardening. This prevents bending of lower part of casing string during period of waiting for hardening of cement slurry and improves quality of well strengthening. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BOREHOLE FIXING | 1990 |
|
RU2057903C1 |
METHOD FOR WELL CASING | 1992 |
|
RU2054527C1 |
METHOD OF CASING CEMENTING | 0 |
|
SU1716098A1 |
METHOD OF PRESSURE TESTING CASING STRING | 1991 |
|
RU2010941C1 |
PROCESS OF BOREHOLE CASING | 1992 |
|
RU2057897C1 |
METHOD FOR SHUTOFF OF INFLOW OF FOREIGN WATER FROM CASING STRING-BORE-HOLE ANNULUS | 1991 |
|
RU2015315C1 |
LINER CEMENTING METHOD | 0 |
|
SU1742466A1 |
A METHOD FOR ERECTION OF CEMENT BRIDGES | 0 |
|
SU1836542A3 |
DEVICE FOR CONTROLLED PLACING OF CEMENT BRIDGING PLUGS IN WELLS | 1992 |
|
RU2044864C1 |
SWIVEL SUSPENSION FOR RUNNING AND CEMENTING FLUSH CASING STRINGS | 0 |
|
SU1262024A1 |