FIELD: well drilling. SUBSTANCE: upon completion of drilling, run into well is casing string which is cemented, secured relative to well walls and its upper part is suspended from wellhead with calculated force. Casing string is secured relative to well walls in two stages:lower part of casing string is secured at the moment of beginning of cement setting, and its upper part is secured in the period after beginning of cement setting, but not later than 2/3 of setting period. Upper part of casing string is suspended during the second period. EFFECT: provided proper sealing of casing string-borehole annulus.
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF BOREHOLE CASING | 1992 |
|
RU2057897C1 |
METHOD FOR STRENGTHENING OF WELL | 1996 |
|
RU2107804C1 |
DEVICE FOR TWO-STAGE CEMENTING OF CASING STRINGS | 1992 |
|
RU2054526C1 |
LINER CEMENTING METHOD | 0 |
|
SU1742466A1 |
METHOD OF PRESSURE TESTING CASING STRING | 1991 |
|
RU2010941C1 |
METHOD FOR SHUTOFF OF INFLOW OF FOREIGN WATER FROM CASING STRING-BORE-HOLE ANNULUS | 1991 |
|
RU2015315C1 |
A METHOD FOR ERECTION OF CEMENT BRIDGES | 0 |
|
SU1836542A3 |
METHOD FOR WELL DRILLING | 0 |
|
SU1801169A3 |
METHOD OF OIL SPOUTER KILLING | 0 |
|
SU1758204A1 |
DEVICE FOR CEMENTING CASING STRINGS | 1990 |
|
RU2043482C1 |
Authors
Dates
1996-02-20—Published
1992-11-30—Filed