FIELD: metallurgy, continuous metal casting installations. SUBSTANCE: the roll has a barrel, thrust journals, bushings and built-up rings of the roll sleeve; the thickness of the built-up layer of the roll sleeve rings equals 0.01 to 0.10 of the roll outside diameter, and the relation of equivalent content of carbon of built-up metal (Ceg.b,%) and roll sleeve metal (Ceg.sl,%) makes up Ceg.b./Ceg.sl.=1.3 to 3.6. EFFECT: improved design. 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF REPAIR OF SHROUDED ROLLERS OF SECONDARY COOLING ZONE OF CONTINUOUS CASTING MACHINES | 1993 |
|
RU2113962C1 |
SHROUDING RING OF ROLLER AND PROCESS OF ITS MANUFACTURE | 1997 |
|
RU2124962C1 |
PROCESS OF SHROUDING OF PARTS | 1997 |
|
RU2111831C1 |
METHOD FOR RESTORING BANDED ROLLER | 1998 |
|
RU2123412C1 |
ROLLER OF SECONDARY COOLING ZONE OF CONTINUOUS CASTING PLANT | 1997 |
|
RU2111084C1 |
ROLLING ROLL | 1995 |
|
RU2087218C1 |
ROLLER OF SECONDARY COOLING ZONE OF MACHINE FOR CONTINUOUS BILLET CASTING | 1991 |
|
RU2010665C1 |
ROLLER FOR CONTINUOUS CASTING MACHINE AND METHOD OF ITS MANUFACTURE | 2000 |
|
RU2166404C1 |
ROLL | 2002 |
|
RU2218219C1 |
METHOD OF REPAIRING PARTS | 1996 |
|
RU2096155C1 |
Authors
Dates
1996-05-27—Published
1993-08-12—Filed