FIELD: mining. SUBSTANCE: tube is used to install tightening rod in a well. The well is filled with friable material through this tube. On withdrawal the tube tightening rod is passed through support slab to be tightened and secured. The rod end is twisted and flattened. The well is filled layer by layer followed by compacting the layers by the end of movable tube. EFFECT: simplification in constructing process is achieved by the method proposed at the expense of coincided operations, simplicity in installation without special additional means, time reduction when anchor bringing to loads with increased bearing capacity. 7 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO INSTALL GROUND ANCHOR | 2011 |
|
RU2457293C1 |
ROOF BOLTING AND PROCESS OF ITS ERECTION | 2000 |
|
RU2169842C1 |
ROOF BOLTING | 2001 |
|
RU2182972C1 |
METHOD FOR INSTALLATION OF ANCHOR | 0 |
|
SU1789719A1 |
ANCHORING BOLTING FOR SLICE MINE DEVELOPMENT | 2003 |
|
RU2234604C1 |
ANCHOR | 2003 |
|
RU2243379C1 |
METHOD FOR STABILIZING ROCK BY RODS IN UNDERGROUND WORKINGS | 1997 |
|
RU2132464C1 |
WALL TIE | 2003 |
|
RU2231645C1 |
METHOD FOR CONTROL OF PNEUMATIC BORE-HOLE DRIVER | 1998 |
|
RU2135701C1 |
METHOD FOR ERECTING ANCHOR SUPPORT | 0 |
|
SU1046531A1 |
Authors
Dates
1996-06-10—Published
1992-03-16—Filed