FIELD: bridge building. SUBSTANCE: first temporary carried out technological support for bridge building machine is constructed from bank before use of the bridge building machine, that is done for each successive stationary intermediate support. In so doing sectional double-track mechanized bridge of gantry type is used as carried out technological support that rests, for example, on ground. The mechanized bridge is laid down and removed using bridge laying device for mechanized bridge of higher carrying capacity. Mechanized bridge of increased carrying capacity is laid using said bridge laying device after construction of stationary intermediate support and removal of technological support with bridge building machine. The mechanized bridge is used as the first span laid from bank to the line of passage at the first stationary support, as well as successive initial building platform to lay down carried out technological support for erecting successive stationary intermediate support with successive laying down the next mechanized bridge of higher carrying capacity. EFFECT: accelerated construction of bridges. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BRIDGING UNIT OF MULTIPLE-SPAN BRIDGE | 1995 |
|
RU2083757C1 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102555C1 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE | 1992 |
|
RU2065515C1 |
DOUBLE-TRACK DOUBLE-SECTION MECHANIZED BRIDGE | 1994 |
|
RU2102552C1 |
METHOD FOR MANUFACTURE OF HALF-TRACKS OF MECHANIZED DOUBLE-TRACK DOUBLE-SECTION SPAN STRUCTURE OF BRIDGE UNIT | 1995 |
|
RU2102553C1 |
BRIDGE BLOCK OF MULTI-SPAN BRIDGE AND DRIVE CARRIAGE (OPTIONS) | 1993 |
|
RU2057836C1 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102556C1 |
INTERMEDIATE GANTRY SUPPORT OF BRIDGE | 1992 |
|
RU2072405C1 |
BRIDGE CONSTRUCTION AND BRIDGE ASSEMBLY MACHINE FOR TRANSPORTATION, ASSEMBLY AND LAYING OF BRIDGE CONSTRUCTION ON OBSTACLE | 2001 |
|
RU2210656C2 |
BRIDGE-LAYING MACHINE | 1996 |
|
RU2102554C1 |
Authors
Dates
1996-08-10—Published
1994-03-24—Filed