FIELD: oil production. SUBSTANCE: cross sections in bulkheads of pump plant are adjustable depending on flow rate. The cross sections are closed in pump shutdown. The bulkheads are made of elastic materials and provided with notches to adjust flow rate of gas/fluid mixture in the process of well operation, and to close tail cross section in well outage. EFFECT: uniform extraction of oil and water from well. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATION OF OIL WELLS OF SMALL DISCHARGE AND DEVICE FOR IMPLEMENTING THE SAME | 1993 |
|
RU2065027C1 |
METHOD FOR HYDRAULIC FRACTURING OF BED | 1995 |
|
RU2109935C1 |
DEVICE FOR OPERATION OF GAS WELLS | 1995 |
|
RU2087681C1 |
METHOD FOR PETROLEUM PRODUCTION AND APPARATUS FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2780982C1 |
METHOD FOR SEPARATED LIFTING OF PRODUCTS OF PRODUCING WELLS | 1992 |
|
RU2054528C1 |
METHOD OF ACTION ON PRE-BOTTOM ZONE OF WELL IN HYDROCARBON FIELD WITH BOTTOM WATER AND RECOVERY OF OIL AND WATER BY PUMPS-COMPRESSORS WITH SEPARATE INTAKE FOR CONELESS OPERATION OF WELL | 2005 |
|
RU2293214C2 |
PROCESS OF COMPLETION, EXAMINATION OF OPERATION OF WELLS | 2001 |
|
RU2202039C2 |
METHOD FOR EXTRACTING OF HIGH-VISCOSITY OIL | 2002 |
|
RU2232263C2 |
METHOD OF RECOVERY OF WELL PRODUCTS AND DEEP-WELL PUMPING DEVICES FOR METHOD EMBODIMENT (VERSIONS) | 1999 |
|
RU2189433C2 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
Authors
Dates
1996-08-10—Published
1993-03-23—Filed