FIELD: gas and oil producing industry. SUBSTANCE: method for separated lifting of products of producing wells includes lowering of tubing string with gravel-packed casing linear below producing formation floor into artificial bottom hole. During withdrawal of gas and fluid, the level of gas-fluid contact in well is maintained not below the level of gas-fluid contact in producing formation. Upper position of gas-fluid contact is maintained by regulating the value of withdrawal of gas through drill string-borehole annulus, and lower position of gas-fluid contact is maintained by installing covering float on gravel-packed casing linear. EFFECT: higher efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL FIELD DEVELOPMENT | 2008 |
|
RU2375562C2 |
PROCEDURE FOR DEVELOPMENT OF GAS-HYDRATES DEPOSITS | 2010 |
|
RU2438009C1 |
METHODS FOR EXPLOITING OIL EXTRACTING WELLS | 2003 |
|
RU2225938C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1999 |
|
RU2171369C2 |
PROCEDURE FOR COMPLETION AND OPERATION OF WELL | 2009 |
|
RU2394978C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL DEPOSIT | 2017 |
|
RU2669950C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
METHOD OF SIMULTANEOUS SEPARATE OPERATION OF MULTI LAYER DEPOSIT AND DEVICE FOR REALIZING SAID METHOD | 2014 |
|
RU2594235C2 |
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
Authors
Dates
1996-02-20—Published
1992-02-14—Filed