FIELD: civil engineering. SUBSTANCE: framework has four columns with above-columns and two ceiling slabs located between them. Width of each slab is 4 m, length of above-column slabs is 3.3 m. Columns are spaced by 6.3 m in width and 6.0 m in length. Framework can be provided with additional columns spaced in plan at pitch in length of 6.0 m and/or in width of 6.3 m pitch. Besides, framework can have at least one standard ceiling slab 4.8 m long and 1.2 m wide located between inter-column and above-column slabs. Framework is also provided with cross-section beams located vertically and/or horizontally relative to columns or slabs. Beam can take form of span piece and located between columns in plan parallel to one framework axes or at angle to it. At this version, framework can be given additional beams, each taking form of rafter leg resting against column or slab or span piece. EFFECT: reduced labour, time and material needed for erection. 25 cl, 27 dwg
Title | Year | Author | Number |
---|---|---|---|
FRAME BUILDING AND METHOD FOR ITS ERECTING | 2000 |
|
RU2173750C1 |
MULTISTORY GARAGE BUILDING | 1998 |
|
RU2134332C1 |
METHOD FOR CONSTRUCTION OF MONOLITHIC STRUCTURES OF BUILDINGS AND NON-REMOVABLE UNIVERSAL MODULAR FORMWORK SYSTEM | 2014 |
|
RU2552506C1 |
RECONSTRUCTED BUILDING AND METHOD FOR LOW-RISE BUILDING RECONSTRUCTION | 2015 |
|
RU2597901C1 |
JOINTLESS FRAME OF BUILDING, STRUCTURE | 2009 |
|
RU2501915C2 |
STRUCTURAL SYSTEM OF MULTISTORY BUILDING AND PROCESS OF ITS ERECTION ( VARIANTS ) | 2000 |
|
RU2197578C2 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
EARTHQUAKE-RESISTANT BUILDING | 2007 |
|
RU2340751C1 |
READY-BUILT AND SOLID-CAST BUILDING CONSTRUCTION SYSTEM | 2008 |
|
RU2376424C1 |
METHOD OF ACCELERATED BUILDING ERECTION USING METHOD OF SCREWDRIVER ASSEMBLY AND BUILDING FROM FACADE PANELS WITH DECORATIVE EXTERNAL FINISHING AND METAL FRAMEWORK | 2016 |
|
RU2633602C1 |
Authors
Dates
1996-08-27—Published
1994-07-29—Filed