FIELD: permafrost drilled hole equipment. SUBSTANCE: in arrangement of productive drilled holes in permafrost areas, production of thermal water, pumping steam into deposits with high viscosity oil and in other cases, thermally insulated lift tube setup is used which has load bearing tube and concentrically installed thermal-insulation housing and rigidly mounted between them are quarter-torus diaphragms. Clearance between housing and diaphragm ends is 205 mm. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT-INSULATED OIL WELL TUBING | 2002 |
|
RU2222685C2 |
THERMO-ISOLATED LIFT PIPE | 2000 |
|
RU2238387C2 |
METHOD OF PREVENTION OF THAW OF WELLBORE REGION IN PERMAFROST ZONE | 1999 |
|
RU2170811C2 |
METHOD OF THAW PREVENTION OF WELLBORE REGION IN PERMAFROST ZONE | 1999 |
|
RU2170810C2 |
PACKER | 1999 |
|
RU2165004C2 |
HEAD ARRANGEMENT OF BORE-HOLE | 1996 |
|
RU2129204C1 |
METHOD FOR HYDRAULIC BREAKAGE OF STRATUM | 1993 |
|
RU2071557C1 |
HARDENABLE SEALANT FOR THREADS | 1996 |
|
RU2110550C1 |
METHOD OF ERECTION OF MULTI-STRATUM UNDERGROUND IN WATER- BEARING HORIZONS | 1996 |
|
RU2102301C1 |
METHOD FOR DETERMINING AMOUNT OF BRINE WATER PENETRATED INTO GAS-CONDENSATE OR OIL DEPOSIT DURING ITS DEVELOPMENT | 1996 |
|
RU2110674C1 |
Authors
Dates
1996-08-27—Published
1993-10-19—Filed