FIELD: nuclear reactors. SUBSTANCE: method involves installation of fuel assembly in separating device, trimming of bottom fastening in air environment within cutting chamber, removal of carrying rod, and sequential removal of top and bottom bundles of fuel elements in cooling pond; separation is made by using folding box built up of two relatively moving parts with self-clamping supporting unit mounted in bottom part of box and hold-down stop placed in top part of box; folding box is provided, in addition, with hopper and collet grip; hopper and hold-down grip are interchangeable parts. EFFECT: improved safety. 6 cl, 15 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR LAYING OUT TWO-BEAM FUEL ASSEMBLY OF NUCLEAR REACTOR AND LAYOUT DEVICE WHICH IMPLEMENTS SAID METHOD | 1992 |
|
RU2080665C1 |
DEVICE FOR SEPARATING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2069902C1 |
CHAMBER OF SEPARATION OF TWO-BEAM ASSEMBLY OF NUCLEAR REACTOR | 1992 |
|
RU2031460C1 |
SHEATHED FUEL ASSEMBLY | 1993 |
|
RU2084023C1 |
METHOD OF STORAGE OF USED NUCLEAR FUEL | 1993 |
|
RU2084025C1 |
METHOD FOR CUTTING LONG COMPONENTS OF NUCLEAR REACTOR | 1997 |
|
RU2125308C1 |
JACKET FOR KEEPING EXHAUSTED NUCLEAR FUEL IN WATER BATH | 1994 |
|
RU2072573C1 |
METHOD AND CHAMBER FOR SEPARATING SPENT TWO- BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR ITS FURTHER DISPOSAL | 1999 |
|
RU2171508C2 |
METHOD AND PREPARATION CHAMBER FOR PREPARING TWO-BUNDLE FUEL ASSEMBLY OF NUCLEAR REACTOR FOR STORAGE | 2002 |
|
RU2219605C2 |
METHOD AND FACILITY FOR STRIPPING SPENT FUEL ASSEMBLY OF NUCLEAR REACTOR | 2001 |
|
RU2208849C2 |
Authors
Dates
1996-09-27—Published
1991-12-27—Filed