FIELD: laying pipe lines in ground. SUBSTANCE: pipes from working foundation pit are forced into receiving pit increasing them in succession and admitting soil into forward pipes which are separated from end pipes by flange. Soil is removed from forward pipes as they enter the receiving pit. Forcing the pipes into pit is effected by means of power, striking or pulling mechanism or by combination of them. EFFECT: enhanced reliability. 10 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FLYING PIPE LINE AND SYSTEM FOR REALIZATION OF THIS METHOD | 1997 |
|
RU2128310C1 |
METHOD OF TRENCHLESS PIPE LAYING | 2007 |
|
RU2338111C1 |
TRENCHLESS PIPELINE REPAIR METHOD | 2022 |
|
RU2786612C1 |
METHOD OF TRENCHLESS REPLACEMENT OF UNDERGROUND PIPELINES | 2013 |
|
RU2528465C1 |
METHOD OF TRENCHLESS PIPELINE CONSTRUCTION | 2006 |
|
RU2326284C1 |
PLANT FOR CONSTRUCTION OF MAIN PIPELINE PASSES UNDER ROADS AND EMBANKMENTS | 1999 |
|
RU2153581C1 |
DEVICE FOR TRENCHLESS LAYING OF PIPELINES IN SOIL | 0 |
|
SU956704A1 |
METHOD FOR TRENCHLESS INSTALLATION OF TRAYS UNDER MOTOR AND RAIL ROADS IN CONSTRUCTION OF MAIN PIPELINES | 2007 |
|
RU2362080C1 |
PIPELINE PULLING METHOD | 2023 |
|
RU2822166C1 |
HYDRAULIC DRIVE FOR TRENCHLESS REPLACEMENT AND UNDERGROUND UTILITIES LAYING (VERSIONS) | 2018 |
|
RU2731259C2 |
Authors
Dates
1996-12-10—Published
1990-10-25—Filed