FIELD: laying of main pipe lines. SUBSTANCE: device for securing pipe line 2 in ground has mat 1 embracing the pipe line, bottom and walls of trench. Mat 1 is made from longitudinal strips 3 and transverse strips 4 fastened together. Sizes of mat cells are dictated by criteria of tensile strength, rupture strength on strength of fastening the strips when pipe line is acted on by operational loads. EFFECT: enhanced reliability. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ANTI-EROSION BED REVETMENT AND BUILDING METHOD THEREOF | 2002 |
|
RU2226586C2 |
ANTIEROSION COVER | 2001 |
|
RU2223360C2 |
SLIDE-PROOF INTERLAYER IN BANK CONSOLIDATION | 1992 |
|
RU2005840C1 |
DEVICE FOR PROTECTION AND FIXATION OF PIPELINE | 2021 |
|
RU2793804C1 |
METHOD OF LAYING PIPE LINES (VERSIONS) AND DEVICE FOR REALIZATION OF THIS METHOD | 2004 |
|
RU2244191C1 |
METHOD AND DEVICE FOR LAYING PIPELINE | 2005 |
|
RU2274793C1 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
UNDERGROUND PIPELINE ROUTING METHOD | 2011 |
|
RU2467240C1 |
DEVICE FOR BALLASTING PIPELINE IN TRENCH | 0 |
|
SU1656268A1 |
A METHOD FOR LAYING UNDERGROUND PIPING | 0 |
|
SU1638419A1 |
Authors
Dates
1997-03-10—Published
1993-01-18—Filed