FIELD: oil production industry. SUBSTANCE: method implies treatment of water in magnetic field by pulse-cyclic operation. Treatment is effected repeatedly by means of unified blocks made up of series-mounted electromagnets of different voltage in each block and at a distance of VLT (m) between electromagnets determined from relation: L = , where L - distance between electromagnets, m; V - water flow speed in tube installed in gap of electromagnets, m/s; t - duration of treatment cycle, s. EFFECT: higher efficiency. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING OIL DEPOSIT NEAR WELL BOTTOM ZONE | 1996 |
|
RU2077664C1 |
METHOD OF TRANSPORTATION OF OIL PRODUCTION FROM OIL WELL VIA PIPE LINES | 1996 |
|
RU2083916C1 |
METHOD FOR OPERATING OIL WELLS | 1996 |
|
RU2077658C1 |
METHOD FOR PUMPING WATER IN INJECTION WELLS | 1996 |
|
RU2077662C1 |
METHOD OF RECOVERY AND MAINTENANCE OF WELL PRODUCTIVITY | 2002 |
|
RU2215126C2 |
PROCESS AND GEAR FOR DEVELOPMENT AND CLEARING OF FACE ZONE OF WELLS BY PULSE DRAINAGE | 1999 |
|
RU2159326C1 |
METHOD OF DEVELOPMENT OF MULTIPAY OBJECT WITH HIGH-VISCOSITY OIL | 2015 |
|
RU2584703C1 |
ACOUSTIC METHOD OF STIMULATION OF WELL AND BED OF MINERAL DEPOSIT | 1998 |
|
RU2143554C1 |
METHOD FOR INCREASE OF INTAKE CAPACITY OF INJECTION WELLS | 1989 |
|
RU2021497C1 |
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSIT | 1996 |
|
RU2104394C1 |
Authors
Dates
1997-03-20—Published
1996-08-22—Filed