FIELD: mining industry. SUBSTANCE: method can be used in mining formations of close seams of minerals at large depths. Seams are divided into panels. Main entries are made in lowest seam or in roof rock of seam located underneath and panels are worked along one of seams. After finishing mining of aforesaid panels and stabilization of process of displacing rock of upper rock mass, mined are panels along other seam. Panels of first seam are mined in downward order beginning from level located at upper boundary of panel, and panels of second seam are worked in upward order beginning from level located at lower boundary of panel. EFFECT: high efficiency. 2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MINERAL SEAM FORMATIONS | 1994 |
|
RU2083827C1 |
METHOD OF WORKING CONTIGUOUS COAL SEAMS | 0 |
|
SU1703818A1 |
METHOD FOR MINING SLOPING COAL BEDS | 0 |
|
SU1666726A1 |
METHOD OF GUARDING OF WORKINGS IN HEAVING SOILS | 1990 |
|
RU2007577C1 |
METHOD OF MINING OF THICK MINERAL BEDS | 2001 |
|
RU2206741C2 |
METHOD FOR MINING MINERAL DEPOSITS AT LARGE DEPTH | 1991 |
|
RU2013548C1 |
COMBINED METHOD FOR MINING OF COAL SEAMSERIES | 1992 |
|
RU2039257C1 |
METHOD FOR MINING MINERAL BEDS AT LARGE DEPTH | 0 |
|
SU1810545A1 |
METHOD FOR DEVELOPMENT OF THICK FLAT BEDS OF MINERALS | 2009 |
|
RU2403386C1 |
METHOD OF WORKING THE SUIT OF THIN AND MEDIUM-THICK GENTLY-SLOPING COAL SEAMS | 0 |
|
SU1221354A1 |
Authors
Dates
1997-06-10—Published
1994-01-10—Filed