FIELD: drilling of oil and gas holes. SUBSTANCE: method can be used for drilling-in of productive reservoirs in conditions of abnormally high reservoir pressure. According to method, in process of drilling, control is maintained of gas inflow to bore-hole. This consists in creation of hydraulic pressure pulses on bottom hole or at bore-hole head and recording signals of pressure in tubes at head of bore-hole and in tube clearance. Equalized condition in bore-hole is maintained by increasing flow rate and/or density of drilling fluid until difference in time in receiving signals of pressure at bore-hole head with regular drilling fluid and in drilling fluid with additives. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR CONTROL OF GAS SHOWS IN WELL | 1997 |
|
RU2107160C1 |
PROCESS OF DRILLING OF OIL AND GAS WELLS AND FACILITY FOR ITS IMPLEMENTATION | 1998 |
|
RU2170317C2 |
PROCEDURE FOR CONTROL OF GAS-OIL INGRESS IN WELL AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2435026C1 |
METHOD FOR MAKING WELL STRAINER | 1991 |
|
RU2015309C1 |
OPENING METHOD FOR OPERATING COLUMN AND PRODUCTIVE LAYER IN OPERATING AND EXPLORATION WELLS | 2002 |
|
RU2224094C2 |
SYSTEM FOR MONITORING WELL-DRILLING PARAMETERS | 0 |
|
SU1476113A1 |
METHOD OF WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2022 |
|
RU2797175C1 |
WELL DEVELOPMENT METHOD | 2004 |
|
RU2272897C1 |
METHOD OF PRODUCING GAS-BEARING FORMATION DRILLING-IN | 2000 |
|
RU2196869C2 |
METHOD FOR CREATION OF GRAVEL FILTER IN WELL | 1999 |
|
RU2146759C1 |
Authors
Dates
1997-06-20—Published
1993-07-22—Filed