FIELD: drilling and blasting operations in mineral deposits located in the permafrost zone. SUBSTANCE: the method consists in drilling of bore-hole 1 with overdrill 4 determined by relation . Then along the bore-hole axis in the area of location of the explosive pipe 2 with a blanked off end and holes 3 on the walls is installed; the diameter and arrangement of the holes is determined by the necessary shape of the explosive charge surface; heat-transfer agent is fed to the pipe under pressure for warming-up and removal of the defrosted layer of permafrost from the walls by settling in overdrill 4 up to formation of cavity 5 of the required shape and volume; then the pipe is removed from the bore-hole. The explosive charge is placed in formed in formed cavity 5 on the defrosted rock in overdrill 4, then an initiating charge is installed and stemming is tamped in the bore-hole. Hot air or steam may be used as a heat-transfer agent. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONTROLLING HARD-DESTRUCTIBLE CEILING UNDER CONDITIONS OF PERMAFROST | 2002 |
|
RU2237809C2 |
METHOD FOR CREATING SETTING SPLIT IN PERMAFROST ROCKS OF MINING FACE ROOF | 1992 |
|
RU2053307C1 |
DEEP-HOLE CHARGE FOR SMOOTH BLASTING | 0 |
|
SU1792519A3 |
METHOD FOR FORMATION OF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2000 |
|
RU2166728C1 |
METHOD FOR DEVELOPMENT OF KIMBERLITE PIPES IN PERMAFROST ZONE | 1997 |
|
RU2132462C1 |
METHOD FOR IMPROVING EFFICIENCY OF PRELIMINARY MOISTENING OF PERMAFROST COAL SEAMS | 1995 |
|
RU2086764C1 |
METHOD FOR INSTALLATION OF BLASTING NETWORK FOR CRUSHING OF DIFFICULTY EXPLOITABLE ROCKS | 1998 |
|
RU2150673C1 |
METHOD FOR INSTALLATION OF BLASTING NETWORK OF SERIES OF OUTBURST CHARGES | 1998 |
|
RU2151373C1 |
METHOD OF SUPPORTING MINE SHAFT COLLAR IN PERMAFROST ROCKS | 1996 |
|
RU2122119C1 |
METHOD FOR FORMATION OF WATER-PROOF EXPLOSIVE CHARGE IN ENTRY FOR ORE-BREAKING | 2001 |
|
RU2210055C2 |
Authors
Dates
1997-07-10—Published
1992-06-18—Filed