FIELD: mining industry.
SUBSTANCE: method includes treatment of resources from limit of extraction column and primary placement of ceiling at distance equal to maximum width of ceiling plate. Method includes also drilling of wells from the surface into prepared excavation column down to mineral resource. First row of wells is placed along border of extraction column, and second row - along lava pit-face at a distance from border of extraction column equal to calculated maximum width of hard-destructible ceiling plate. After extraction of mineral resource from border of extraction column and opening wells of first row pipes are inserted into them having plugged lower ends and apertures at lower portions of pipes. Perforated portions of pipes are placed adjacent to expected places of ceiling rock solids destruction and heat carrier is fed into pipes under pressure to form hollow spaces in the wells. After displacement of lava pit-face and opening wells of second row in them hollow spaces are also formed in similar manner. Primary placement of ceiling is performed after mounting support beams along lava and extracting individual supports from extracted space.
EFFECT: reliable controllability of primary placement of frozen hard-controlled rock solids and excluded losses of mineral resource.
2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO CONTROL HARD ROOF UNDER CONDITIONS OF CRYOLITHIC ZONE | 2011 |
|
RU2478786C1 |
METHOD OF PRIMARY COLLAPSE-PROOF ROOF CAVING PREPARATION IN PERMAFROST ENVIRONMENT | 2006 |
|
RU2331766C1 |
METHOD FOR FORMATION OF CAVING SLOT IN LONGWALL FACE-TO-GATE JUNCTIONS | 1992 |
|
RU2039260C1 |
METHOD FOR ROOF ROCK DISPLACEMENT MEASUREMENT IN PERMAFROST ZONE CIRCUMSTANCES | 2006 |
|
RU2310750C2 |
METHOD OF DIFFICULT-TO-CAVE ROOF CONTROL IN MINING OF COAL SEAMS BY POWERED MINING SET | 1996 |
|
RU2151293C1 |
METHOD TO MANAGE HARD-TO-COLLAPSE ROOF WHEN MINING GAS-BEARING BEDS IN LONG FACES WITH MECHANICAL COMPLEXES | 2011 |
|
RU2471989C1 |
METHOD FOR DIFFICULT-TO-CAVE ROOF PREPARATION FOR INITIAL CAVING | 2005 |
|
RU2312219C2 |
METHOD OF CONTROLLING PRIMARY SETTING OF HARD-CAVING ROOF | 0 |
|
SU1298350A1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
CONTROL METHOD OF POORLY CAVING ROOF AT MINING OF GAS-BEARING FORMATIONS IN FACES WITH MECHANISED COMPLEXES | 2011 |
|
RU2472931C1 |
Authors
Dates
2004-10-10—Published
2002-12-27—Filed