FIELD: oil and gas industry. SUBSTANCE: this is intended for drilling oil and gas wells with high level of ecological requirements, that is with no pollution to environment. Closed-circuit or circulation water supply system of bore-hole has following interconnected components: clear water unit 1, closed circuits for preparation and treating of drilling liquid 2, receiving vessels 3, drilling liquid purification unit with following successively interconnected vibrating sieves 6, sand separator 7, silt separator 8, sludge wash-off unit together with centrifuge 9, vibrating sieve 10, settler 11, circulation water vessel 12, preliminary cleaning unit 16, final cleaners 17, unit for treating with chemical reagents 24, 25, system for transporting and burial of washed-off sludge 14, 26. EFFECT: high efficiency. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HOLE ARRANGEMENT METHOD | 1993 |
|
RU2065915C1 |
CLOSED RECIRCULATED WATER SUPPLY SYSTEM FOR WELL DRILLING | 2004 |
|
RU2331752C2 |
METHOD FOR OIL AND GAS WELL CASING CEMENTING | 1989 |
|
RU2016188C1 |
INSTALLATION FOR CLEANING THE WATER SURFACE OF PETROLEUM POLLUTION | 1991 |
|
RU2011787C1 |
DRILLING WASTEWATER TREATMENT PLANT | 1992 |
|
RU2047728C1 |
METHOD FOR LIQUIDATING EARTHY PIT-ACCUMULATOR PROVIDED FOR WASTES FROM DRILLING | 1992 |
|
RU2040633C1 |
METHOD FOR LIQUIDATION OF GROUND STORAGE-COLLECTOR OF DRILLING WASTE | 1997 |
|
RU2123574C1 |
DRILLING WASTE NEUTRALISATION METHOD AND PLANT FOR ITS IMPLEMENTATION | 2012 |
|
RU2519861C2 |
DRILLING MUD CLEANING METHOD AND DEVICE | 2003 |
|
RU2258795C2 |
METHOD OF INTEGRATED TREATMENT FOR DRILL MUD, DRILLING WASTEWATER AND OF NEUTRALISATION OF DRILL CUTTINGS IN PROCESS OF WELL DRILLING WITHOUT CONSTRUCTION OF MUD PITS AND DEVICE FOR METHOD IMPLEMENTATION | 2013 |
|
RU2541957C1 |
Authors
Dates
1997-07-20—Published
1991-12-09—Filed