FIELD: mining. SUBSTANCE: breakage and developing faces coupled in one drift are separated in space. Drilling rigs are installed under back cantilever of powered support. Anchors are installed using these rigs to suspend roof bars of drift support. EFFECT: higher efficiency. 2 cl, 11 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING TO MINING FLAT-LYING COAL SEAM | 1995 |
|
RU2086765C1 |
METHOD OF FULL DEVELOPMENT OF GENTLY SLOPING COAL BEDS WITH POWER-DRIVEN SYSTEMS WITHOUT ANY PREPARATORY MINE WORKINGS | 2010 |
|
RU2444624C1 |
METHOD OF MINING COAL SEAMS | 0 |
|
SU1728488A1 |
METHOD FOR EXTRACTING MASSIVE SLOPING COAL BED BY HORIZONTAL DESCENDING LAYERS WITH FULL FILLING OF EXTRACTED SPACE | 2002 |
|
RU2233983C1 |
SHAFT-SINKING COMPLEX | 1990 |
|
RU2006584C1 |
OPEN-UNDERGROUND MINING OF COAL SEAMS | 2013 |
|
RU2524709C2 |
METHOD FOR DEVELOPMENT OF THIN AND VERY THIN COAL BEDS | 2020 |
|
RU2743721C1 |
METHOD OF SLANT COAL SEAMS DEVELOPMENT | 1994 |
|
RU2068498C1 |
METHOD FOR FORMING A DISMANTLING CHAMBER WHEN DEVELOPING SLIM COAL BEDS | 2020 |
|
RU2743162C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF FLAT COAL BEDS PRONE TO SPONTANEOUS IGNITION | 2019 |
|
RU2726752C1 |
Authors
Dates
1997-01-20—Published
1994-02-08—Filed