FIELD: construction and repairing of pipe lines. SUBSTANCE: in repairing and insulating a pipe line a bank of plastic tubes are received in it. The space between the pipe line and tubes are filled with plugging solution such as foam cement. EFFECT: simplified method. 2 cl, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PLUGGING FOAM-CEMENT COMPOSITION FOR PLUGGING WRAPPER OR BRIDGE | 1995 |
|
RU2089717C1 |
OIL-WELL FOAM CEMENT COMPOSITION | 2000 |
|
RU2176308C2 |
FOAM-CEMENTING PLUGGING MATERIAL FOR BOREHOLES FIXATION | 2016 |
|
RU2623759C1 |
METHOD FOR ISOLATING WATER IN FRACTURED POROUS BEDS | 2001 |
|
RU2232256C2 |
FOAM CEMENT BACKFILL MATERIAL | 2017 |
|
RU2654112C1 |
METHOD OF PRODUCING FOAMED-CEMENT PLUGGING MATERIAL | 0 |
|
SU1633094A1 |
SUPERLIGHTWEIGHT FOAM-CEMENT PLUGGING FLUID | 0 |
|
SU927973A1 |
INSTALLATION METHOD OF EASILY BREAKABLE CEMENT PLUG IN HORIZONTAL WELL | 2014 |
|
RU2565618C1 |
INSTALLATION METHOD OF EASILY BREAKABLE CEMENT PLUG IN HORIZONTAL WELL | 2014 |
|
RU2565616C1 |
CASING STRING BACK CEMENTING METHOD | 2019 |
|
RU2720720C1 |
Authors
Dates
1997-08-20—Published
1995-03-13—Filed