FIELD: oil and gas industry.
SUBSTANCE: installation method of easily breakable cement plug in horizontal well includes running in of the tubing string to a horizontal well up to interval of the plug setting, injecting of cement grout and chalk stone and flush fluid through the tubing string up to the plug setting interval, breaking of the plug with hydrochloric acid solution upon repair. Reduced-weight cement slurry with density of 1270-1410 kg/m3 is used as cement grout; it is based on sedimentation stable plugging material (SSPM) with the following ratio of ingredients, by weight fractions: SSPM 29.2-49.3, choke stone 9.8-23.4, water - the remaining share. Processing medium based on xanthane polymer with density of 1010-1600 kg/m3 is used as flush fluid, it is injected before and upon injection of reduced-weight cement slurry in volume not less than 30% of the volume of reduced-weight cement slurry at that for the purpose of breaking the plug of reduced-weight cement slurry the tubing string with jet nozzle is run in to the horizontal well and the plug is impacted by jet of 12% inhibited hydrochloric acid with rotation and axial shift of the tubing string from the wellhead, thereupon reaction products are flushed from the horizontal well.
EFFECT: increased sealing at the plug setting in the horizontal well, increased strength of the set plug.
3 tbl
Title | Year | Author | Number |
---|---|---|---|
INSTALLATION METHOD OF EASILY BREAKABLE CEMENT PLUG IN HORIZONTAL WELL | 2014 |
|
RU2565616C1 |
METHOD OF DRILLING AND DEVELOPMENT OF OFFSHOOT FROM HORIZONTAL WELL (VERSIONS) | 2019 |
|
RU2709262C1 |
PLUGGING FOAM-CEMENT COMPOSITION FOR PLUGGING WRAPPER OR BRIDGE | 1995 |
|
RU2089717C1 |
PREPARATION METHOD OF COMPOUND FOR ACID-SOLUBLE PLUGGING STONE PRODUCTION | 2013 |
|
RU2519144C1 |
INSTALLATION METHOD OF CEMENT BRIDGE IN WELL | 2016 |
|
RU2644360C1 |
INSULATION METHOD OF WATER INFLUX AND WELL THIEF ZONE | 2008 |
|
RU2378490C1 |
METHOD OF INJECTING INTO WELLS | 1994 |
|
RU2109128C1 |
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
WATER INFLOW ZONES CEMENTING METHOD | 2013 |
|
RU2533997C1 |
METHOD FOR CREATING CEMENT BRIDGE IN WELL | 1999 |
|
RU2146756C1 |
Authors
Dates
2015-10-20—Published
2014-10-13—Filed