FIELD: oil and gas extractive industry.
SUBSTANCE: method includes consecutive pumping of isolating compound and cementing solution into the well, as well as pumping of buffer fluid into the well, pumping of buffer fluid is performed before isolating compound, and before pumping cement solution is treated by surfactant and dispersed by gas-like agent until receiving solution density in the well which matches density of bed water.
EFFECT: higher effectiveness of water isolation in fractured porous beds due to more reliable blocking of isolating compound in pit-face area of well with open shaft with large power value.
1 tbl
Title | Year | Author | Number |
---|---|---|---|
WELLS HIGH INTENSITY ABSORPTION INTERVALS INSULATION METHOD AND AERATED SLURRY FOR ITS EXECUTION | 2008 |
|
RU2379474C2 |
METHOD OF INSULATING THIEF ZONES | 2004 |
|
RU2277574C1 |
METHOD OF TREATMENT OF BOTTOMHOLE FORMATION ZONE | 2014 |
|
RU2566344C1 |
GROUTING COMPOSITION FOR INSULATION OF ZONES OF INTENSIVE ABSORPTION | 2013 |
|
RU2542063C1 |
METHOD OF EFFECTING BOTTOMHOLE ZONE OF PRODUCER FOR INCREASED YIELD OF OIL | 2007 |
|
RU2361075C1 |
FOAM CEMENT BACKFILL MATERIAL | 2017 |
|
RU2654112C1 |
METHOD OF WATER ISOLATION IN CARBONATE AND CARBONIZED FORMATIONS | 0 |
|
SU1710698A1 |
INSULATION METHOD OF FORMATION WATER INFLOW AND LINING METHOD OF BOTTOM-HOLE FORMATION ZONE | 2013 |
|
RU2554957C2 |
METHOD OF OIL FORMATION DEVELOPMENT CONTROL | 2001 |
|
RU2191894C1 |
PLASTIC COMPOSITION FOR FORMATION WATER INFLOW INSULATION IN WELL AND STABILIZING OF PRODUCING FORMATION AND METHOD OF ITS APPLICATION | 2016 |
|
RU2627786C1 |
Authors
Dates
2004-07-10—Published
2001-11-28—Filed