FIELD: equipment for electrochemical processes. SUBSTANCE: installation for heating lining of cathode housing and baking interblock seams of carbon bottom of aluminium electrolyzer enables performing quality baking of bottom with minimum expenses on its manufacturing. Installation contains two rows of burners, fuel reservoirs, and pipeline system. Burners in one row are shifted in relation to those in other row, and distance between them in one row is 0.12-0.40 as large as length of electrolyzer pit. EFFECT: facilitated baking of bottom. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
GEAR FIRING BOTTOM OF ALUMINIUM ELECTROLYZER | 1996 |
|
RU2100488C1 |
INSTALLATION FOR FIRING BOTTOM OF ALUMINUM ELECTROLYZER | 1996 |
|
RU2104335C1 |
UNIT FOR HEATING AND BURNING ELECTROLYZER HEARTH IN ALUMINIUM PRODUCTION | 0 |
|
SU734312A1 |
APPARATUS FOR BURNING CARBON LINING OF CATHODE OF ALUMINUM ELECTROLYZER | 1997 |
|
RU2111289C1 |
METHOD OF BURNING ALUMINIUM ELECTROLYZER | 1994 |
|
RU2092619C1 |
METHOD OF PUTTING IN OPERATION OF ALUMINIUM ELECTROLYZER AFTER FIRING | 1994 |
|
RU2080416C1 |
METHOD OF BURNING BOTTOM OF ALUMINIUM ELECTROLYSER | 2007 |
|
RU2370572C2 |
METHOD OF HEATING AND PUTTING ALUMINUM ELECTROLYZER INTO OPERATION | 1997 |
|
RU2116382C1 |
METHOD OF FIRING AND PUTTING IN OPERATION OF ALUMINIUM ELECTROLYZER (VARIANTS) | 1996 |
|
RU2106434C1 |
ALUMINIUM CELL HEARTH | 1997 |
|
RU2120500C1 |
Authors
Dates
1997-08-27—Published
1995-02-24—Filed