FIELD: mining industry and construction, conducting of sparing, blasting operations in flooded rocks. SUBSTANCE: after the water-proof flexible hose is placed in the well it is fixed in the bottom-hole formation zone of the well to its walls around the edges to a height of 1 to 5 well diameters by pushing-apart forces acting from the hose interior; a mixture of components with a chemically active gas-generating addition introduced in the process of charging is used as water-containing explosive; when fed to the hose this mixture has a density exceeding the well water density, and the density of finished water-containing explosive after completion of chemical reaction of gas-generating addition at least with one of the components of the water-containing explosive is lower than the well water density. EFFECT: facilitated procedure. 2 cl
| Title | Year | Author | Number |
|---|---|---|---|
| PROCESS OF CHARGING OF HOLES GOING DOWN FOR SPARING EXPLOSION AND DEVICE FOR ITS IMPLEMENTATION | 1998 |
|
RU2133007C1 |
| PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
| METHOD FOR FORMING COUNTER CHARGES OF EMULSION EXPLOSIVE SUBSTANCES | 1990 |
|
RU2061864C1 |
| METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
| METHOD OF CHARGING WATER PRODUCING WELLS WITH BULK SOLID HYDROLABILE EXPLOSIVE SUBSTANCES (VERSIONS) | 2007 |
|
RU2341767C1 |
| CHARGING SHAPING HOSE FILLED WITH WELL WATER DURING CHARGING | 2024 |
|
RU2831655C1 |
| COMBINATION EXPLOSIVE CHARGE | 2004 |
|
RU2280236C1 |
| COMPOSITION OF EMULSION EXPLOSIVE | 2003 |
|
RU2252926C2 |
| CHARGING WELLS WITH EXPLOSIVE EMULSION | 2015 |
|
RU2573660C1 |
| METHOD FOR LOADING INCLINED WELLS | 2006 |
|
RU2305823C1 |
Authors
Dates
1997-08-27—Published
1995-07-18—Filed