FIELD: mining and construction industry, sparing blasting while excavating valuable crystal starting material, working of benches of quarries. SUBSTANCE: characteristic feature of process consists in anchoring of water-tight end of polyethylene hose placed into flooded or dry holes near bottom by means of parachute-catch, in feed of emulsion explosive with gas- generating additive in amount enabling density of explosive in hose to be diminished to (0,4÷0,8)•103 kg/m3. EFFECT: increased efficiency of blasting operations while excavating valuable crystal starting material. 11 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CHARGING OF FLOODED DOWNCAST WELLS WITH WATER-CONTAINING EXPLOSIVES | 1995 |
|
RU2088893C1 |
HOSE FOR CHARGING FLOODED WELLS WITH LOW-DENSITY EXPLOSIVE COMPOSITION | 2023 |
|
RU2818120C1 |
HOSE FOR CHARGING FLOODED WELLS WITH LOW-DENSITY EXPLOSIVE COMPOSITION | 2024 |
|
RU2824083C1 |
PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
PROCESS OF BREAKING OF ROCKS ON EARTH SURFACE BY BLAST | 1995 |
|
RU2095746C1 |
METHOD FOR LOADING WATERED RISING WELLS | 2008 |
|
RU2362970C1 |
METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
METHOD FOR LOADING INCLINED WELLS | 2006 |
|
RU2305823C1 |
METHOD OF CHARGING WATER PRODUCING WELLS WITH BULK SOLID HYDROLABILE EXPLOSIVE SUBSTANCES (VERSIONS) | 2007 |
|
RU2341767C1 |
METHOD FOR FORMING COUNTER CHARGES OF EMULSION EXPLOSIVE SUBSTANCES | 1990 |
|
RU2061864C1 |
Authors
Dates
1999-07-10—Published
1998-01-14—Filed