FIELD: borehole drilling. SUBSTANCE: method includes making principal pit, lining it with metal tubes of protective casing and flow string. Protective casing is installed above productive stratum and flow string is fixed by way of deepening casing tubes into productive stratum to predetermined depth, after which horizontal section of borehole is made using open-cut method with decreased-diameter trepan. EFFECT: increased reliability of process. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONDUCTION, FIXATION AND DEVELOPMENT OF MULTIDIRECTIONAL WELL | 2008 |
|
RU2386775C1 |
METHOD OF DRILLING HORIZONTAL WELLS WITH PILOT SHAFT | 2015 |
|
RU2587660C1 |
METHOD OF CONDUCTING, FIXATION AND RECLAMATION OF MULTIDIRECTIONAL WELL | 2008 |
|
RU2386006C1 |
CONSTRUCTION METHOD OF WELL SHAFT THROUGH UNSTABLE CLAY MINE ROCKS | 2012 |
|
RU2474669C1 |
METHOD OF DRILLING WELLS OR SECOND BOREHOLES WITH HORIZONTAL COMPLETION | 2006 |
|
RU2351734C2 |
METHOD FOR BUILDING WELLS WITH REMOTE FACE | 2006 |
|
RU2295024C1 |
PROCEDURE FOR CONSTRUCTION OF HORIZONTAL WELL IN DEVONIAN STRATA | 2009 |
|
RU2421586C1 |
METHOD FOR DRILLING HORIZONTAL WELL HAVING DISTANT BOTTOM | 2004 |
|
RU2278939C1 |
WELL CONSTRUCTION METHOD | 2014 |
|
RU2541978C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT WITH POROUS-CAVERNOUS-FRACTURED MANIFOLD | 2012 |
|
RU2474679C1 |
Authors
Dates
1997-09-10—Published
1994-10-20—Filed