FIELD: heat supply. SUBSTANCE: required pressure is maintained in the reverse pipe line in the portion connected to the additional heat source due to making-up by pumps from the major reverse pipe line connected with the major heat source. EFFECT: simplified method. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT SUPPLY SYSTEM AND ITS OPERATION ARRANGEMENT METHOD | 2010 |
|
RU2434144C1 |
HEAT SUPPLY SYSTEM | 2017 |
|
RU2641880C1 |
PROCESS OF CONTROL OVER HEAT CONDITION OF ALUMINUM ELECTROLYZER | 1998 |
|
RU2124586C1 |
PROCESS OF FORMATION OF SELF-BAKlNG ANODE OF ALUMINIUM ELECTROLYZER | 1994 |
|
RU2078852C1 |
COMBINATION HEAT AND POWER GENERATING PLANT | 2006 |
|
RU2300636C1 |
DEVICE FOR MANUFACTURE OF UNDERPIN PLUGS FOR SELF-BAKING ANODE OF ALUMINUM ELECTROLYZER WITH TOP CURRENT LEAD | 1992 |
|
RU2038425C1 |
BOILER HOUSE | 1996 |
|
RU2105247C1 |
0 |
|
SU1670297A1 | |
GAS-TURBINE PLANT | 1995 |
|
RU2095600C1 |
UNIT FOR BAUXITE LEACHING | 1992 |
|
RU2033968C1 |
Authors
Dates
1997-09-10—Published
1994-11-01—Filed