FIELD: mining industry. SUBSTANCE: this reduces volume of hauling operations in filling worked-out space and developing deposits without establishing pillars. According to method, workings are driven from day surface to ore body, spiral working is driven, ore in work face is loosened by blasting, ore is removed by stopes along strikes, ore is gathered, transported and worked-out space is gobbed. Spiral working is driven in rock and ore sections. Loosening of ore is effected from inter-spiral layer when work face reaches spiral working in second and subsequent ore sections. Worked-out space is gobbed with rock from driving of spiral working. Created at top and bottom of working section in inter-spiral layer are coverings. Arranged under cantilever side of ore body of next stope is flexible movable screen. Upper covering is built before start of gathering loosened ore in stopes. Lower covering and flexible screen are arranged prior to filling worked-out space after stopes. EFFECT: high efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
OPENING OF DEPOSIT AT UNDERGROUND MINING | 2014 |
|
RU2591705C1 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
METHOD OF MINING THICK STEEP ORE BODIES | 0 |
|
SU1580008A1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU1453003A1 |
METHOD FOR SUBTERRANEAN EXCAVATION OF MINERAL DEPOSITS BY MEANS OF CHAMBER-COLUMN METHOD | 2002 |
|
RU2232894C1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU1446311A1 |
METHOD FOR MINING OF THIN GENTLY DIPPING ORE BODIES | 1992 |
|
RU2039265C1 |
METHOD FOR DEVELOPING THIN AND LOW-POWERED STEEL-FALLING ORE BODIES | 2021 |
|
RU2755287C1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
Authors
Dates
1997-10-27—Published
1991-08-22—Filed