FIELD: mineral concentration. SUBSTANCE: method includes feed of initial supply to hydraulic classification in hydraulic cyclone, separation of overflow and sands, return of sands to operation of hydraulic classification, stopping of feed of initial supply upon expiration of the preset time, further hydraulic classification of circulating product to obtain the preset grade of concentration of noble metals. Taken as upper limit of the preset value of fraction of total mass of solid matter in supply of hydraulic cyclone is 50%. The amount of supplied water is determined from condition βsolid ≅ , where βsolid is current value of solid fraction of total mass in supply of hydraulic cyclone; is preset value of solid fraction of total mass in supply of hydraulic cylinder. EFFECT: higher efficiency. 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SELECTIVE GRINDING MATERIAL | 1994 |
|
RU2095140C1 |
JIGGING MACHINE | 1994 |
|
RU2077388C1 |
METHOD OF JIGGING | 1994 |
|
RU2077387C1 |
JIGGING MACHINE | 1994 |
|
RU2077389C1 |
METHOD OF DRESSING GOLD-CONTAINING PRODUCTS | 2015 |
|
RU2598668C1 |
PRODUCTION LINE FOR RECOVERY OF NOBLE METALS FROM ROCKS | 1994 |
|
RU2068301C1 |
DRESSING MODULE | 2008 |
|
RU2376069C2 |
METHOD OF CENTRIFUGAL SEPARATION | 2018 |
|
RU2690590C1 |
METHOD FOR ARRANGING PULP FOR FLOTATION OF MAGNETIC FRACTION FROM CONCENTRATES OF SULPHIDE COPPER-NICKEL ORES CONTAINING FERROMAGNETIC MINERALS OF IRON AND PRECIOUS METALS | 2008 |
|
RU2370316C1 |
METHOD FOR PRODUCING HIGH-QUALITY MAGNETITE CONCENTRATES | 2020 |
|
RU2754695C1 |
Authors
Dates
1997-11-10—Published
1994-03-24—Filed