FIELD: railway construction engineering. SUBSTANCE: this relates to upper structure of railway track. According to method, switch or frog chair 1 is installed on switch plate 2 or frog carriage. Switch or frog chair 1 is connected with switch plate or frog carriage. In installing, switch or frog chair 1 is axially aligned with axis of at least one hole preliminarily made along longitudinal axis of switch plate 2 or frog carriage. Connection is effected by welding over hole perimeter. EFFECT: high efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR FASTENING FRAMING RAIL IN RAIL SWITCH | 1996 |
|
RU2095511C1 |
METHOD OF MANUFACTURING SWITCH TONGUE | 1996 |
|
RU2094488C1 |
METHOD OF JOINING ARTICLES FROM HIGH-CARBON STEEL WITH ARTICLE FROM HIGH-MANGANESE AUSTENITIC STEEL | 1998 |
|
RU2129938C1 |
RAIL BASEPLATE MAKING METHOD | 2000 |
|
RU2200784C2 |
RAIL BASEPLATE | 1996 |
|
RU2112100C1 |
SWITCH POINT | 1996 |
|
RU2097467C1 |
METHOD FOR JOINTING RAMP AND FRAME RAIL IN POINTWORK AND POINTWORK OBTAINED BY THIS METHOD | 2023 |
|
RU2814930C1 |
METHOD FOR INDUCTIVE THERMAL HARDENING OF SWITCH RAILS AND INSTALLATION FOR ITS IMPLEMENTATION | 2022 |
|
RU2794329C1 |
SWITCH | 2000 |
|
RU2206655C2 |
SIDE SUPPORT OF RAIL FASTENING FOR TURNOUTS ON REINFORCED CONCRETE BASE AND METHOD FOR REGULATING POSITION OF RAILS IN HORIZONTAL PLANE IN TURNOUTS WITH ITS HELP | 2023 |
|
RU2815139C1 |
Authors
Dates
1997-11-10—Published
1996-06-18—Filed