FIELD: oil and gas production industry. SUBSTANCE: according to method, development of deposit is effected by injection of displacing agent through system of injection vertical and/or horizontal wells with recovery of oil through system of producing horizontal and/or vertical wells. Connection of producing well with producing oil reservoir is effected in areas of oil fringe with relatively high filtration resistance between filter and gas-oil and/or water-oil contacts. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
GAS-OIL DEPOSITION WITH SMALL WATER-FLOATING OIL CONTOURING | 1986 |
|
SU1410596A1 |
DEVELOPMENT METHOD OF OIL FRINGE IN CARBONATE RESERVOIR OF COMPLEX STRUCTURE | 2012 |
|
RU2509878C1 |
METHOD OF DEVELOPMENT OF OIL FRINGE AND UNDER-GAZ ZONE OF COMPLEX DEPOSITS | 2015 |
|
RU2606740C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH GAS CAP | 1996 |
|
RU2101476C1 |
METHOD FOR EDGE OIL RIM DEVELOPMENT | 2010 |
|
RU2442882C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT WITH USE OF IN-BED OXIDIZING PROCESSES | 1996 |
|
RU2105872C1 |
METHOD FOR DEVELOPMENT OF OIL-AND-GAS AND WATER-OIL-AND-GAS POOLS HAVING VAST UNDERGAS ZONES | 0 |
|
SU1825393A3 |
METHOD OF DEVELOPMENT OF OIL-AND-GAS DEPOSITS WITH BOTTOM WATER | 2012 |
|
RU2519243C1 |
METHOD FOR DEVELOPMENT OF OIL RIM OF OIL AND GAS CONDENSATE RESERVOIR | 2010 |
|
RU2433253C1 |
Authors
Dates
1997-11-10—Published
1995-09-15—Filed