FIELD: gas-oil industry. SUBSTANCE: off-gas flows are pumping out by debit hole (C) using from gas zone above water surface to form workable oil cone so good as it is possible by setting on pumping rate using in hole mouth of gas-oil bed contact. Oil is pumping out from contouring oil through oil cone made preliminary. Gas is repumping to zone of gas bed to overpressing gas bed. Gas and oil extraction is making in turn, but operation rate is growing up slowly to prevent water cone formation in floor working. EFFECT: better efficiency of oil extraction from floating oil bed. 2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL-GAS CONDENSATE FIELD | 1987 |
|
SU1527990A1 |
METHOD FOR HYDROCARBON POOL DEVELOPMENT | 2005 |
|
RU2313661C2 |
METHOD FOR HYDROCARBON DEPOSIT DEVELOPMENT | 2005 |
|
RU2313664C2 |
METHOD FOR DEVELOPMENT OF STRUCTURALLY COMPLEX OIL DEPOSIT WITH THIN OIL FRINGE | 1995 |
|
RU2095552C1 |
METHOD OF DEVELOPMENT OF OIL FRINGE AND UNDER-GAZ ZONE OF COMPLEX DEPOSITS | 2015 |
|
RU2606740C1 |
METHOD FOR DEVELOPMENT OF GAS AND OIL RESERVOIR UNDERLAIN WITH WATER WITH HYDROCARBON PRODUCTION UNDER PRESSURE | 2020 |
|
RU2749229C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2002 |
|
RU2279539C2 |
METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2007 |
|
RU2334870C1 |
METHOD OF DEVELOPMENT OF OIL-AND-GAS DEPOSITS WITH BOTTOM WATER | 2012 |
|
RU2519243C1 |
METHOD OF OIL POOL DEVELOPMENT WITH GAS CAP AND BOTTOM WATER | 2008 |
|
RU2386804C1 |
Authors
Dates
1994-06-30—Published
1986-07-31—Filed