FIELD: mining industry. SUBSTANCE: this can be used for combined development of oil and potassium deposits which fully or partially coincide in plan. According to method, oil is recovered from wells and watering of oil beds is performed through injection wells. Potassium salts are extracted in mines and processed and liquid waste is buried in deep water-carrying horizons. Watering of oil beds is effected by means of solutions of sodium chloride with concentration of 5-25%. Used for preparation of solutions are excess salt brines of potassium production with addition of hexametaphosphate in amount sufficient for binding ions of calcium into soluble complex in contacting of injected solutions with brines, and this is also performed for preventing corrosion of oil field equipment. EFFECT: high efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONTROL OVER STRESSED STATE OF SEISMIC REGION | 1998 |
|
RU2150721C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2000 |
|
RU2178069C1 |
METHOD FOR OIL FIELD DEVELOPMENT | 2006 |
|
RU2307240C1 |
METHOD OF DEVELOPING OIL AND GOLD DEPOSITS | 1998 |
|
RU2152512C1 |
METHOD FOR UTILIZATION OF SURPLUS BRINES AT POTASSIUM ENTERPRISES | 1997 |
|
RU2133334C1 |
METHOD OF JOINED DEVELOPMENT OF OIL AND POTASSIUM DEPOSITS | 2003 |
|
RU2244107C1 |
METHOD FOR DEVELOPMENT OF OIL RESERVOIR | 1996 |
|
RU2086758C1 |
METHOD OF DEVELOPING NONUNIFORM HYDROCARBON POOL | 1999 |
|
RU2167280C2 |
METHOD OF WATER-FLOODING OF OIL FORMATION | 2000 |
|
RU2175383C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS | 1997 |
|
RU2127802C1 |
Authors
Dates
1997-11-10—Published
1996-04-08—Filed