FIELD: oil production industry. SUBSTANCE: according to method, undertaken is renewal of perforation of up to 10 holes per linear meter of perforation interval. Powder charge is burnt at bottom hole. Acid solution is injected in portions. Injected in first portion is acid solution of high concentration and in small volume, injected in second portion is acid solution of low concentration and in large volume. Pressure of injecting portions is maintained close to value of well casing string testing pressure. Injected is working agent which is used in development, and injection flow rate is 6-10 l/s in injection mode of 2-4 h, injection time 0.12-0.5 h. Technological delay is continued until reaching required injectivity of well with subsequent transfer to agent injection procedure in mode of deposit development operation. EFFECT: high efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING BOTTOM-HOLE ZONE OF WELL | 1998 |
|
RU2124631C1 |
METHOD OF TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1996 |
|
RU2091570C1 |
METHOD OF BUTTOMHOLE ZONE TREATMENT | 2002 |
|
RU2208151C1 |
METHOD OF TREATMENT OF WELL BOTTOMHOLE ZONE WITH LOW BED PRESSURE | 2013 |
|
RU2537433C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF OIL BED | 1996 |
|
RU2095559C1 |
METHOD OF TREATING RESERVOIR WITH LIQUID COMBUSTIBLE-OXIDIZING COMPOUND | 1996 |
|
RU2092682C1 |
TREATMENT METHOD FOR BOTTOMHOLE ZONE OF INJECTION WELL | 2004 |
|
RU2258134C1 |
METHOD FOR TREATING DOWN-HOLE ZONE OF OIL BED | 1997 |
|
RU2095560C1 |
DEVELOPMENT METHOD OF HIGH VISCOUS OIL OR BITUMEN DEPOSIT | 2019 |
|
RU2706154C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1997 |
|
RU2114295C1 |
Authors
Dates
1997-11-10—Published
1997-02-18—Filed