FIELD: materials handling facilities; lifting of flat structures and long-cut articles. SUBSTANCE: load-gripping device has two pairs of slings 2, member for hanging the slings from hook 6 of load-lifting mechanism in form of split two-member shackle 1. One member of shackle has triangular metal plate 4 with holes in the corners of triangle hinge- connected in top corner of triangle with shackle 1 and in base, with one pair of slings 2. Length of slings of first pair is 0.85-0.9 of length of second pair slings which is connected with second member of shackle 1. Triangular metal plate 4 operates as stabilizer equalizing tension forces in four slings 2. Each pair of slings 2 can be furnished with telescopic brace 9 providing lifting of long cut articles 10 at angle of 90 degree. EFFECT: enlarged operating capabilities. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
LOAD-GRIPPING DEVICE | 1997 |
|
RU2130892C1 |
GRIPPING DEVICE FOR ARTICLES WITH LONGITUDINAL CAVITIES | 1996 |
|
RU2098340C1 |
REINFORCING CAGE OF REINFORCED CONCRETE FLOOR SLABS | 1993 |
|
RU2033506C1 |
ERECTION LOOP | 1997 |
|
RU2117741C1 |
METHOD OF MANUFACTURE OF REINFORCED CONCRETE MULTICAVITY ARTICLES | 1996 |
|
RU2101170C1 |
BUILDING SLAB | 1996 |
|
RU2100540C1 |
REINFORCED CONCRETE RAFTER | 1995 |
|
RU2083778C1 |
APPARATUS FOR MANUFACTURE OF FERROCONCRETE PRODUCTS WITH CURVED SURFACE | 1998 |
|
RU2134636C1 |
LOAD GRIPPING DEVICE | 1994 |
|
RU2081048C1 |
PRESTRESSED REINFORCED CONCRETE FRAMEWORK OF BUILDING | 1998 |
|
RU2133801C1 |
Authors
Dates
1997-11-20—Published
1996-04-12—Filed