FIELD: oil and gas industry. SUBSTANCE: this can be used for recovery of hydrocarbon liquid from depleted oil reservoirs in oil and gas production industry. According to method, producing string is run down with lift of smaller diameter pipes and high-pressure chamber. This chamber is made of larder diameter pipes which are fastened on lift by means of adapter. Gas is injected into underground reservoir through inter-string space. Liquid is displaced from inter-string space and annular passage of high-pressure chamber. Gas is delivered from inter-spring space and reservoir to lift through high-pressure chamber. Liquid is recovered from gas lift. Upper part of high-pressure chamber is located above level of liquid in reservoir and is connected with reservoir. Gas is delivered from high-pressure chamber to lift through non-return valve. Created behind high-pressure chamber is column of liquid, and injection pressure and gas flow rate are maintained constant. EFFECT: high efficiency. 1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR FLUID RECOVERY FROM UNDERGROUND STORAGE TANK | 0 |
|
SU1745898A1 |
METHOD AND DEVICE FOR REMOVING LIQUID FROM GAS-CONDENSATE WELL | 1996 |
|
RU2114284C1 |
METHOD AND DEVICE FOR EXTRACTING PETROLEUM GAS FROM SEDIMENTARY ROCKS WITH GAS HYDRATE INCLUSIONS | 2022 |
|
RU2803769C1 |
WET GAS OR GAS CONDENSATE WELL RECOVERY METHOD AND ITS DROWNING PREVENTION DURING ITS FURTHER OPERATION | 2013 |
|
RU2534291C1 |
METHOD FOR GAS-LIFTING OPERATION OF WELL - CONTINUOUS-DISCONTINUOUS GAS-LIFT AND DEVICE FOR REALIZATION OF SAID METHOD | 2003 |
|
RU2239696C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
CONSTRUCTION OF WELL WITH PRESSURE CONTROL, OPERATIONS SYSTEM, AND METHODS APPLIED TO OPERATIONS WITH HYDROCARBONS, STORAGE AND PRODUCTION BY DISSOLUTION | 2011 |
|
RU2563865C2 |
PIPE STRING SYSTEM FOR SELECTIVE REGULATION OF FLUID FLOWS WITH VARIABLE SPEEDS IN WELLS FORKING FROM ONE COMMON WELLBORE | 2011 |
|
RU2556560C2 |
PROCEDURE FOR SIMULTANEOUS OPERATION OF SEVERAL OBJECTS IN PRODUCER AND DEVICE FOR ITS IMPLEMENTATION | 2010 |
|
RU2438008C1 |
METHOD OF SIMULTANEOUS-SEPARATE DEVELOPMENT OF SEVERAL PRODUCTIVE FORMATIONS AND WELL UNIT FOR METHOD EMBODIMENT | 2001 |
|
RU2211311C2 |
Authors
Dates
1997-11-20—Published
1994-11-04—Filed