FIELD: oil and gas production. SUBSTANCE: method and device provide simultaneous combined action on clogs with mechanical tool, water jet, and heat from heated wash fluid. EFFECT: speeded up unclogging. 3 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR WELL OPERATION | 2010 |
|
RU2421602C1 |
METHOD FOR ASPHALT-TAR-PARAFFIN, HYDRATE AND ICE PLUGS BREAKAGE IN PRODUCTION WELLS | 2006 |
|
RU2312975C1 |
DEVICE TO PREVENT HYDRATE AND PARAFFIN DEPOSITS IN FLOW PIPES OF OIL AND GAS WELLS | 2004 |
|
RU2272893C2 |
PROCEDURE FOR REMOVING PARAFFIN-HYDRATE BLOCKS IN OIL WELLS AND FACILITY FOR IMPLEMENTATION OF THIS PROCEDURE | 2009 |
|
RU2398956C1 |
METHOD FOR DESTRUCTION OF HYDRATE-ICE, ASPHALTENE-RESIN AND PARAFFIN DEPOSITIONS IN WELL PROVIDED WITH SUCKER ROD PUMP | 1999 |
|
RU2137908C1 |
METHOD OF ELIMINATING PARAFFIN LOCKS IN GAS CONDENSATE WELLS | 0 |
|
SU1789543A1 |
EXOTHERMIC METHOD OF REMOVING ASPHALT-RESIN-PARAFFIN SEDIMENTS IN TUBING | 2023 |
|
RU2817448C1 |
PROCESS OF ELIMINATION OF PARAFFIN, HYDRATE AND ICE PLUGS IN OPERATING WELLS | 2000 |
|
RU2199650C2 |
METHOD OF WELL OPERATION | 2006 |
|
RU2349744C2 |
METHOD FOR HYDRATE, GAS-HYDRATE AND HYDRATE-HYDROCARBON DEPOSIT LIQUIDATION | 2006 |
|
RU2320851C1 |
Authors
Dates
1997-11-27—Published
1994-07-15—Filed