FIELD: oil production, particularly underground and thorough well repair to remove asphalt-tar-paraffin, hydrate and ice plugs in hole annuity and tube space of wells provided with pumping units.
SUBSTANCE: method involves creating through inclined channel in face plate; installing lubricator; lowering heater in hole annuity through lubricator; melting plug and injecting working agent. Ball valve is installed in through inclined channel. Lubricator is retained over the ball valve. Before working agent injection processing liquid is additionally supplied under pressure in hole annuity simultaneously with heater lowering and plug melting up to full plug removal from hole annuity.
EFFECT: increased efficiency of asphalt-tar-paraffin, hydrate and ice elongated plugs removal.
7 cl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ELIMINATION OF PARAFFIN, HYDRATE AND ICE PLUGS IN OPERATING WELLS | 2000 |
|
RU2199650C2 |
METHOD AND DEVICE FOR MELTING BLIND HYDRATEPARAFFIN PLUG | 1997 |
|
RU2110670C1 |
METHOD OF WARMING-UP OF HYDRATE-PARAFFIN PLUGS IN OIL AND GAS WELLS | 2002 |
|
RU2212522C1 |
DOWNHOLE HEATER | 2000 |
|
RU2186944C2 |
METHOD OF DESTRUCTION OF PARAFFIN, HYDRAULIC, HYDRATION-WAX AND ICE DEPOSITS IN DEVELOPMENT WELLS FOR SUPPORT OF THEIR WORKING REGIME | 2017 |
|
RU2655265C1 |
METHOD OF WELL OPERATION | 2006 |
|
RU2349744C2 |
METHOD OF ELIMINATION OF HYDRATE AND PARAFFIN-HYDRATE PLUGS IN WELLS AND DEVICE FOR METHOD EMBODIMENT | 2001 |
|
RU2204698C1 |
DEVICE FOR BREAKAGE OF DEAD, EXTENDED PARAFFIN, HYDRATE AND ICE PLUGS IN OPERATING WELLS | 1998 |
|
RU2151274C1 |
DEVICE TO PREVENT HYDRATE AND PARAFFIN DEPOSITS IN FLOW PIPES OF OIL AND GAS WELLS | 2004 |
|
RU2272893C2 |
PROCESS OF RESTORATION OF WELLS UNFIT FOR FURTHER USE | 1999 |
|
RU2176724C2 |
Authors
Dates
2007-12-20—Published
2006-04-24—Filed