FIELD: pre-tension of the steel in building conditions. SUBSTANCE: steel with a passive anchor on one end is tensioned by a hydraulic jack to the design value, then the sleeve is fixed by resting of its butt end on the mould by the rod punch of the hydraulic cylinder, and sleeve moulding is performed in the direction of application of tensile force of the steel; the mould moves relative to the fixed sleeve and steel. EFFECT: facilitated procedure. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TENSIONING FITTING WITH ANCHOR | 1992 |
|
RU2037041C1 |
METHOD FOR TENSIONING AND FIXING OF ROPE REINFORCEMENT | 1998 |
|
RU2134759C1 |
METHOD OF REINFORCING MEMBERS MANUFACTURE FOR PRESTRESSED STRUCTURES | 1998 |
|
RU2149961C1 |
DEVICE FOR TENSIONING AND FIXING OF REINFORCEMENT | 1998 |
|
RU2132431C1 |
METHOD OF FASTENING ANCHOR DEVICE TO ROPE REINFORCEMENT | 1997 |
|
RU2122084C1 |
DEVICE FOR TENSIONING OF REINFORCEMENT | 1996 |
|
RU2101435C1 |
DEVICE FOR TENSIONING OF REINFORCEMENT | 1996 |
|
RU2104377C1 |
REINFORCED CONCRETE RAFTER | 1995 |
|
RU2083778C1 |
DEVICE FOR TENSIONING OF ARMATURE | 1996 |
|
RU2105116C1 |
DEVICE FOR TENSIONING OF ARMATURE | 1996 |
|
RU2105115C1 |
Authors
Dates
1997-12-10—Published
1995-10-19—Filed