FIELD: construction engineering. SUBSTANCE: device is intended for pretensioning of reinforcement in production of prestressed reinforced concrete structures. Device has mechanism for tensioning of reinforcement with clamps, and mechanism for compressing anchoring sleeves. Both mechanisms are located coaxially. Compressing mechanism is provided with hydraulic cylinder with forcing rod, and with die which is installed inside hydraulic cylinder case. Tensioning mechanism is made in the form of additional hydraulic cylinder which is installed on forcing rod of hydraulic cylinder of compressing cylinder. Tensioning mechanism operates so as to ensure permanent tensioning force for reinforcement. Tensioning of reinforcement and its fixing are performed in single operation. Application of aforesaid embodiment of device increases production capacity, excludes manual labour. Device is simple in design and of small overall dimensions. EFFECT: higher efficiency. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TENSIONING FITTING WITH ANCHOR | 1992 |
|
RU2037041C1 |
METHOD FOR TENSIONING AND FIXING OF ROPE REINFORCEMENT | 1998 |
|
RU2134759C1 |
METHOD OF TENSIONING OF THE STEEL WITH ANCHOR SLEEVE | 1995 |
|
RU2098572C1 |
METHOD OF REINFORCING MEMBERS MANUFACTURE FOR PRESTRESSED STRUCTURES | 1998 |
|
RU2149961C1 |
METHOD OF FASTENING ANCHOR DEVICE TO ROPE REINFORCEMENT | 1997 |
|
RU2122084C1 |
DEVICE FOR TENSIONING OF REINFORCEMENT | 1996 |
|
RU2104377C1 |
DEVICE FOR TENSIONING OF REINFORCEMENT | 1996 |
|
RU2101435C1 |
DEVICE FOR TENSIONING OF ARMATURE | 1996 |
|
RU2105116C1 |
DEVICE FOR TENSIONING OF ARMATURE | 1996 |
|
RU2105115C1 |
METHOD FOR ERECTION OF MULTISTORY FRAMEWORK BUILDING | 1998 |
|
RU2137886C1 |
Authors
Dates
1999-06-27—Published
1998-03-13—Filed