FIELD: civil engineering for erection of prestressed structures with tensioning of reinforcement under conditions of construction. SUBSTANCE: method of reinforcing members manufacture from coil includes unwinding of rope reinforcement, its straightening and cutting into measured members. Each measured member ends is fixed by clamping devices and longitudinal force equalling 0.5-0.7 of rated resistance to tension of reinforcement is applied to one of ends. Then ends of measured member are released from clamps. In places of crumpling of reinforcement, anchor sleeves are installed and pressed around. EFFECT: reduced specific material consumption, higher accuracy of tensioning. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF TENSIONING OF THE STEEL WITH ANCHOR SLEEVE | 1995 |
|
RU2098572C1 |
METHOD OF TENSIONING FITTING WITH ANCHOR | 1992 |
|
RU2037041C1 |
METHOD OF FASTENING ANCHOR DEVICE TO ROPE REINFORCEMENT | 1997 |
|
RU2122084C1 |
METHOD FOR TENSIONING AND FIXING OF ROPE REINFORCEMENT | 1998 |
|
RU2134759C1 |
DEVICE FOR TENSIONING AND FIXING OF REINFORCEMENT | 1998 |
|
RU2132431C1 |
REINFORCED CONCRETE RAFTER | 1995 |
|
RU2083778C1 |
DEVICE FOR TENSIONING OF REINFORCEMENT | 1996 |
|
RU2101435C1 |
METHOD FOR ERECTION OF PRESTRESSED MULTIPLE-BAY BUILDING FRAME | 1998 |
|
RU2140495C1 |
INSERTION PART | 1993 |
|
RU2040648C1 |
METHOD FOR ELECTROTHERMALLY APPLYING TENSION TO HIGH-STRENGTH REINFORCEMENT BARS | 0 |
|
SU1686096A1 |
Authors
Dates
2000-05-27—Published
1998-12-18—Filed