FIELD: shipbuilding. SUBSTANCE: integral river pushed train is formed from small-sized sharp-bow sections having recess in stern between side stops-fairings; aft recess of section located in front of it is filled with bow projection of section located behind it. One or two pushers enter aft recesses of train sections; aft projection of leading self-propelled forming attachment fills contraction between fore projections of leading sections of two-line train with structural unit between them for change of position of sections and leading self-propelled forming attachment relative to one another and freedom of pitching of up to 15 deg in swell at maintenance of longitudinal strength and transverse rigidity of train as a whole. EFFECT: enhanced longitudinal strength and rigidity of train. 8 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
SHIPS TRAIN | 1997 |
|
RU2113374C1 |
TAXIING-UP PUSHER TUG | 1997 |
|
RU2137671C1 |
SHALLOW-DRAFT PUSH-TRAIN | 2000 |
|
RU2183172C2 |
PUSHED SHIP TRAIN | 1996 |
|
RU2097255C1 |
COUPLED FOR CONNECTING PUSHER WITH NONSELF-PROPELLED VESSEL | 1997 |
|
RU2117601C1 |
PUSHED SHIP TRAIN | 1994 |
|
RU2096244C1 |
BILGE SHORES OF SHIPS OF PUSHABLE TRAIN | 1996 |
|
RU2124999C1 |
SEA-GOING PUSHED INTEGRAL UNIFIED TRAIN | 1993 |
|
RU2104207C1 |
RIVER PUSHED TRAIN ERECTED FROM UNIFIED SECTIONS | 1994 |
|
RU2104208C1 |
MODULAR INTEGRAL BARGE TOWING TRAIN | 2012 |
|
RU2488512C1 |
Authors
Dates
1997-12-20—Published
1995-02-27—Filed