FIELD: construction, in particular, erection of monolithic buildings with employment of external and internal forms and light-weight concrete. SUBSTANCE: framework consisting of uprights 2 installed around the edges of the cell, cross members 3 located between uprights 2, and reinforcement 4 mounted between uprights 2 and cross member 3 is installed on foundation 11 or previous tier. Then the external (6) and internal (7) forms are installed, and the space between the forms is grouted with light-weight concrete. Then the concrete is subjected to vibration and cured up to congelation. EFFECT: facilitated procedure. 2 dwg
Authors
Dates
1997-12-20—Published
1996-03-13—Filed