FIELD: construction engineering. SUBSTANCE: this can be used in reconstruction of long buildings with addition of more storeys. According to method, reconstruction is effected in succession by dividing building into sections and operating section after section. Holes are made in roof of building and elbow-shaped supports are installed in them so that their lower part rests on existing ceiling of upper storey, and lower part is outside building. Supports are installed simultaneously on adjacent sections of building to be reconstructed. Supports are fixed by strut members and guide members are installed on tops of supports. Using guide members as load-bearing parts, tent is erected above selected section. Under protection of tent, old structures of building are dismantled and new structures are erected. After that, tent is moved to next section being reconstructed. Simultaneously with reconstruction of current section, freed temporary support are disassembled and installed on following section of building. Tent and all remaining supports are dismantled on completion of reconstruction operations. EFFECT: high efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONSTRUCTION OF BUILDING | 1996 |
|
RU2101438C1 |
PROCESS OF ERECTION OF SUPERSTRUCTURE OF BUILDING | 1995 |
|
RU2097513C1 |
METHOD OF BUILDING UPDATING | 1998 |
|
RU2149964C1 |
METHOD FOR REBUILDING MULTISTORIED RESIDENTIAL BUILDING | 1997 |
|
RU2120009C1 |
METHOD FOR RECONSTRUCTION OF BUILDING | 1995 |
|
RU2085679C1 |
FLOORING FOR FRAMELESS BUILDINGS | 1995 |
|
RU2083777C1 |
METHOD OF BUILDING RECONSTRUCTION | 1995 |
|
RU2078885C1 |
REINFORCED CONCRETE RAFTER | 1995 |
|
RU2083778C1 |
WALL | 1996 |
|
RU2109888C1 |
METHOD OF REINFORCEMENT OF STRIP FOUNDATION | 1997 |
|
RU2130996C1 |
Authors
Dates
1998-01-10—Published
1996-06-24—Filed