FIELD: oil production industry. SUBSTANCE: according to method, increased oil recovery is achieved due to larger embracing of bed by watering. Performed during drilling and operation is investigation of wells and determined are parameters of oil bed. Structural map is plotted and revealed are wells with high level mark of bed roof. Limited is injection of water into injection wells with high level mark of bed, and recovery of liquid is increased in producing wells. In result, bed pressure is reduced below pressure of saturating oil with gas. Gas separates from oil and occupies roof part of bed, and oil is displaced to lower parts of bed. Injected water reagent goes to roof part of bed, thus displacing oil to producing wells. EFFECT: high efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
METHOD FOR DEVELOPING OIL DEPOSITING CARBONATE COLLECTORS OF FISSURE-CAVITY TYPE | 1992 |
|
RU2073791C1 |
METHOD FOR DEVELOPMENT OF WATER-OIL BED | 1998 |
|
RU2146760C1 |
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM-ZONE OIL FIELD | 1998 |
|
RU2142556C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM-HORIZON OIL DEPOSIT | 1999 |
|
RU2172396C2 |
METHOD FOR DEVELOPMENT OF ZONAL NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2118448C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 1999 |
|
RU2171369C2 |
METHOD FOR EXPLOITATION OF OIL DEPOSIT OF COMPLEX STRUCTURE IN LATE STAGE | 1993 |
|
RU2077663C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2101475C1 |
Authors
Dates
1998-01-10—Published
1996-08-06—Filed