FIELD: development of multihorizon oil deposits with discontinuous lenticular formations. SUBSTANCE: method provides for drilling of deposit by system of horizontal and horizontal-radial wells. Products are withdrawn from horizontal wells and displacement agent is injected. Horizontal-radial well is located across extent of horizontal producing wellbores on the side of their end part. Horizontal wellbore of this well is directed over main producing formation and radial wellbores are drilled with tapping of lenticular and discontinuous interlayers. Displacement agent is injected by cycles, both, to horizontal and radial wellbores. EFFECT: higher rate of deposit development due to increase of production rate of wells operating with low productivity. 2 cl, 2 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MASSIVE-TYPE DEPOSIT | 1995 |
|
RU2095551C1 |
METHOD FOR DEVELOPMENT OF HETEROGENEOUS MULTILAYER OIL FIELD | 1991 |
|
RU2024740C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM-ZONE OIL FIELD | 1998 |
|
RU2142556C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT | 1999 |
|
RU2172395C2 |
PROCESS OF EXPLOITATION OF MULTIPOOL OIL DEPOSIT | 1993 |
|
RU2057913C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT MADE UP OF NONUNIFORM RESERVOIRS | 1994 |
|
RU2085723C1 |
METHOD FOR DEVELOPMENT OF ZONAL NONUNIFORM OIL DEPOSIT | 1996 |
|
RU2118448C1 |
METHOD OF OIL DEPOSIT DEVELOPMENT | 2011 |
|
RU2439299C1 |
METHOD OF DEVELOPING WATER-FLOODED OIL POOL | 2000 |
|
RU2179234C1 |
METHOD FOR NON-UNIFORM MULTIZONE OIL POOL DEVELOPMENT | 2004 |
|
RU2270332C1 |
Authors
Dates
2001-08-20—Published
1999-08-18—Filed